TARIFF STRUCTURE
EXISTING TARIFF, TARIFF AS PROPOSED BY PSEB
AND TARIFF AS APPROVED BY THE COMMISSION
FOR 2006-07 APPLICABLE W.E.F. APRIL 01, 2006
Sl. No.Category of consumersExisting TariffProposed tariff by PSEBTariff approved by the Commission
Energy Rate P/KWHMMC Rs./ KW or part thereofFixed charges Rs. per KVAEnergy charges P / KWHMMC Rs./ KW or part thereofEnergy Rate P/KWHMMC Rs./ KW or part thereof
A) PERMANENT SUPPLY
  1) Domestic supply       
 a) Upto 100 units2213002603522130
 b) 101 to 300 units368043335368
 c) Above 300 units389045835389
 2) Non-Residential4231090For supply ‹= 11 KV 498
For supply › 11 KV 498
128


128
423109
 3) Public lighting423As per 8 hrs/ day0498As per 8 hrs/day423As per 8 hrs/ Day
 4) Irrigation tubewellsi) Without Govt. subsidy 214 Ps / kwh or Rs. 208/ BHP / Month

ii) With Govt. subsidy * 57 Ps / kwh or Rs. 60 / BHP / Month
N.A.i) Without Govt. subsidy



ii) With Govt. subsidy
252 Ps/kwh or Rs.245/BHP/ Month


0
i) Without Govt. subsidy 214 Ps / kwh or Rs. 208/ BHP / Month

ii) With Govt. subsidy     0
N.A.
 5) Industrial supply       
 a) Small power33789039610533789
 b) Medium supply3721190438140372119
 c) Large supply       
 i) General industry372119145/ KVA3720372119
 ii) PIU372328145/ KVA3720372328
 iii) Arc Furnace372312145/ KVA3720372312
 6) Bulk supply       
 HT

LT
382

406

Avg. 394
179 / KVA

179 / KW
0

0
449

478
211/ KVA

211/ KW
382

406

Avv. 394
179/KVA

179/KW
 7) Railway traction443179 / KVA180 per KVA3850443179/KVA
 8) Outside state248N.A.   248N.A.
B) SEASONAL INDUSTRY : COTTON GINNING, PRESSING AND BAILING PLANT, RICE SHELLERS / HULLER MILLS, RICE BRAN STABILIZATION UNITS (WITHOUT T.G. SETS) (SP, MS, LS)
 a) During season
( 1st Sep to 31st May)
next year
SP
MS
LS
337
372
372
328
328
328
0
0
145
396
438
372
386
386
0
From Sept 1 to end Feb. next year
337
372
372
178
238
238
 b) Off season

SP
MS
LS
400
431
428
N.A.
N.A.
N.A.
0
0
145
471
507
372
0
0
0
From March 1 to Aug. 31
337
372
372
45
60
60
C) ICE FACTORY & ICE CANDIES AND COLD STORAGE
 a) Season (April to July)

SP
MS
LS
337
372
372
447
(April to July)
0
0
145
396
438
372
526
526
0
337
372
372
447
(April to July
 b) Off Season

SP
MS
LS
- do -89
89
89
0
0
145
396
438
372
105
105
0
337
372
372
89
89
89
D) GOLDEN TEMPLE, AMRITSAR AND DURGIANA TEMPLE, AMRITSAR
 Golden Temple, Amritsar       
 a) First 2000 unitsFreeN.A. 00FreeN.A.
 b) Beyond 2000 units301N.A. 0354301N.A.
 Durgiana Temple, Amritsar       
 a) First 2000 unitsAs per pattern applicable for Golden Temple, AmritsarAs per pattern applicable for Golden TempleAs per pattern applicable for Golden Temple, Amritsar
 b) Beyond 2000 units
E) TEMPORARY SUPPLY
 i) Domestic663Rs. 551 or Rs. 110 / KW whichever is higherProposed to increase the existing tariff by 15% for all categories663Rs.551 or Rs.110/KW whichever is higher
 ii) NRS663Rs. 1102 or Rs. 276 / KW whichever is higher663Rs.1102 or Rs.276/KW whichever is higher
 iii) Industrial
(SP, MS & LS)
As per tariff approved at A(5) above for permanent supply + 100%Rs. 441 / KW of sanctioned loadAs per tariff approved at A(5) above for permanent supply + 100%Rs.441/KW of sanctioned load
 iv) wheat thrasher-do--do--do--do-
 v) Fairs, exhibition & melas CongregationsBulk supply tariff as at A(6) + 50%Rs. 4411 per serviceBulk supply tariff as at A(6) + 50%Rs.4411 per service
 vi) Touring Cinemas

a) Lights and fans
b) Motive load


663
Rate for Industrial permanent supply as at A(5) + 100%
For (a) and (b) Rs. 1102 or Rs. 276/KW of sanctioned load whichever is higher

663
Rate for Industrial permanent supply as at A(5) + 100%
For (a) and (b) Rs. 1102 or Rs. 276/KW of sanctioned load whichever is higher

* with effect from September 1, 2005, the supply to Irrigation tubewells has been made free.

NOTES
  1. Domestic consumers belonging to SC category with connected load upto 500 watts will be given 200 units of free power per month in view of Govt. subsidy;

  2. AP consumers will not be charged service charges and meter rentals in view of Govt. subsidy;

  3. DS and NRS consumers shall continue to be charged MMC on the basis of actual sanctioned load and no rounding off should be carried out for computing the MMC;

  4. Meter rentals, recoverable costs of meter/metering equipment damaged due to fault/negligence of consumer and rates of security deposit for meter/metering equipment shall be as per revised rates approved separately. All other charges including rentals and deposits which are being collected by the Board as per the “Sales Regulations for Supply of Energy to Consumers”, will be continued at the existing rates;

  5. Classification and billing procedure of seasonal industries shall be as per revised General Conditions of Tariff approved separately;

  6. Checking of load of DS consumers shall continue to be suspended.